Equipment supply
Air Solutions, in collaboration with TE I&C Co., supplied 10 FRIMEC PRC-C900 units for Phase 1 and 15 FRIMEC PRC-C900 units for Phase 2.

RETAIL & COMMERCIAL
Air-conditioning systems for a commercial complex developed in two phases. Air Solutions, in collaboration with TE I&C Co., supplied 25 rooftop units with a combined cooling load of 710 TR. Installation was carried out by TE I&C Co.

THE PROJECT
QCC Commercial Complex comprises two commercial buildings developed in two phases, commonly called QCC1 and QCC2. The buildings stand on opposite sides of the street and are linked by the covered Art Bridge.
The combined development area is reported as approximately 125,000 m². A historical project profile reports approximately 48,000 m² for City Centre 1. These are reported development figures, rather than verified retail lettable areas or the area served by the supplied equipment.
Air Solutions supplied FRIMEC equipment for both phases in collaboration with TE I&C Co. The supplied equipment has a combined cooling load of 710 TR across 25 units, with installation carried out by TE I&C Co.
Air Solutions, in collaboration with TE I&C Co., supplied 10 FRIMEC PRC-C900 units for Phase 1 and 15 FRIMEC PRC-C900 units for Phase 2.
TE I&C Co. carried out installation of the supplied air-conditioning equipment for the project.
EQUIPMENT SUPPLIED
| Phase | Equipment | Units | Cooling load |
|---|---|---|---|
| Phase 1 | FRIMECPRC-C900 | 10 | 284 TR |
| Phase 2 | FRIMECPRC-C900 | 15 | 426 TR |
| Combined total | 25 | 710 TR | |
The building exterior during the construction period.
A crane lifts a wrapped unit onto the rooftop alongside other delivered equipment.
Wrapped units positioned along the roof during the installation works.