Equipment supply
Air Solutions supplied the VRF systems in collaboration with TE I&C Co. for the project’s 1,988 TR (6,991.50 kW) cooling system.

RESIDENTIAL · OVERSEAS
VRF cooling for a twin-tower residential development, with 1,988 TR (6,991.50 kW) of cooling capacity. Air Solutions supplied the equipment in collaboration with TE I&C Co.; TE I&C Co. is carrying out installation and commissioning.

THE PROJECT
NR Twin Towers is an overseas development comprising two residential towers. Development is more than 90% complete. The published project profile describes a mix of apartments and shared spaces for residents.
Property marketing reports a gross built-up area of 62,750 m² and 210 apartments, ranging from 95 m² one-bedroom homes to 238 m² three-bedroom homes. Gross built-up area refers to the overall development, rather than the area served by the cooling system.
The marketed plans include a lobby, pool, fitness and leisure facilities, alongside shared cultural and meeting spaces. These describe planned amenities; their operating status has not been confirmed.
The project’s VRF system has a cooling capacity of 1,988 TR (6,991.50 kW). Air Solutions supplied the equipment in collaboration with TE I&C Co., which is carrying out installation and commissioning.
PROJECT DELIVERY
Air Solutions supplied the VRF systems in collaboration with TE I&C Co. for the project’s 1,988 TR (6,991.50 kW) cooling system.
TE I&C Co. is carrying out installation and commissioning of the supplied VRF system. These works are in progress.