Indoor climateAdvanced
Beyond temperature: designing for humidity and outdoor air
Understand sensible heat ratio, ventilation moisture and part-load behaviour when evaluating comfort in humid conditions.

A room can reach its temperature setpoint and still feel uncomfortable. In humid conditions, the design must account for water vapour as well as sensible heat. This becomes particularly important when outdoor air, infiltration or occupancy adds moisture while the temperature-driven cooling demand is low. The answer begins with a moisture balance and a control strategy, rather than a lower thermostat setting.
Check total, sensible and latent duty separately. Decide which equipment treats outdoor-air moisture, then verify performance during both peak and low sensible-load operation.
An equal total capacity is not necessarily an equal match
Sensible cooling reduces air temperature. Latent cooling removes moisture through condensation when coil conditions permit it. The sensible heat ratio, or SHR, is sensible capacity divided by total capacity at specified conditions. It is a performance result to check at the design point, not a fixed label that applies to every operating condition.
Consider a hypothetical room requiring 6 kW sensible and 2 kW latent cooling. Its total requirement is 8 kW and its load SHR is 0.75. A hypothetical unit delivering 8 kW with an SHR of 0.85 supplies 6.8 kW sensible but only 1.2 kW latent cooling. Matching the total alone leaves a latent shortfall of 0.8 kW.
These figures illustrate the distinction; they are not performance data for a Mitsubishi Electric model. Verify coil duty at the selected airflow and entering-air conditions.
Further reading: Trane TRACE: design psychrometrics and coil-load calculations
Assign responsibility for outdoor-air moisture
A dedicated outdoor-air system can treat ventilation air separately from the units serving room loads. The design must define its leaving-air moisture condition and the remaining latent duty assigned to the room equipment. Simply delivering the specified air quantity does not establish that its moisture content is suitable.
Relative humidity depends on temperature, so use dew point or humidity ratio when comparing airstreams and tracing moisture. Also consider infiltration and exhaust replacement air. A balanced ventilation schedule does not eliminate uncontrolled air entry through frequently opened doors or a poorly coordinated building-pressure strategy.
Further reading: ASHRAE Handbook: dedicated outdoor-air systems
Quantify the moisture load
Assume 0.24 kg/s of dry air must be treated from a humidity ratio of 0.018 to 0.009 kg of water per kg of dry air. The required removal is 0.24 × (0.018 − 0.009) = 0.00216 kg/s, or approximately 7.8 kg of water per hour.
Using an approximate latent heat of 2,450 kJ/kg gives a latent duty of about 5.3 kW. Sensible cooling, fan heat and any other loads are additional. This simple balance shows why specifying ventilation by air volume alone can miss a substantial part of the cooling duty.
The airflow and moisture conditions are hypothetical teaching inputs, not UAE design-weather values. A project calculation should use the agreed weather data, airstream properties and psychrometric method.
Further reading: Trane TRACE: sensible and latent load calculation method
Check the conditions between the peaks
The highest dry-bulb temperature does not necessarily produce the greatest coil or moisture load. Review humid periods, lightly occupied hours and operation after a setback as well as the peak-temperature case. An outdoor-air system and room units may need different schedules because their loads do not disappear at the same time.
Define how humidity will be monitored and what the system will do when temperature is satisfied but moisture remains high. Depending on the design, this may involve dedicated dehumidification and a coordinated reheat strategy. Evaluate the energy effect of that strategy; unnecessary cooling and reheating should not become a hidden default.
Further reading: IEA EBC: resilient energy systems for hot and humid climates
Specify a measurable indoor-climate outcome
Define the acceptance conditions
Agree temperature and humidity criteria, sensor locations, occupied hours and the outdoor conditions used to assess performance.
Keep loads and equipment boundaries clear
Show which unit handles ventilation, infiltration and room moisture. Avoid either omitting a load or counting it twice.
Trend both temperature and humidity
Use time-aligned readings and record outdoor conditions and operating states. A temperature-only handover cannot establish moisture performance.
Compare products and request advice
Open the product range linked below to compare specifications. For selection advice, send your floor plan, room use and proposed model codes.
Explore commercial indoor systemsAsk us a question